The French Alps belong to the Western Alps and with their highest summit, Mont Blanc, they are a world renowned winter sports paradise. That aside, the entire alpine region is also one huge energy storage area, with many reservoirs which are used for the supply of drinking water and the production of hydropower for the supply of electricity.

The required dam walls of concrete must be inspected and renovated regularly. During the inspection of the reservoir Girotte near Hauteluce in Savoy in the French Alps, significant defects were discovered. The dam wall measuring 510 metres in length and 48.5 metres in height was completed in 1948.

The renovation presented serious challenges for man and material.
In addition to several massive cracks, it was also discovered that the concrete had aged prematurely. The uncontrolled loss of water was another problem with this building. Once the loose component parts were removed from the cracks and filled with a special adhesive, acrylate gel was injected in order to seal off any hidden and/or inaccessible hollows.

The company SPIE, carrying out the work, decided to use the material Polyura PC 4840 Purea from Dratec in order to protect the aging concrete at its weak points. When choosing the suitable application technology, the French company decided to use the high performance WIWA DUOMIX PU 460. The core of this unit is the fluid heater, the heat transfer area of which is approximately 70% larger than the heat transfer areas of competitive units. The coating material does not have any direct contact with the heating elements and can thus be heated gently from 20 °C to 85 °C in only 3 minutes. Additional requirements were the process safety such as phase control, differential pressure switching control and the control of the mixing ratio. The electrically heated hose package measuring 48 metres complemented the specification requirements.

Michel Laksander, the WIWA representative in France, supervised the first use on site in order to ensure the process-safe coating for this project, as well as for all other future projects of the company SPIE.

프랑스 알프스는 서부알프스의 그들의 가장높은 정상, 세계적으로 겨울 스포츠 파라라이스라 알려져 있는 몽블랑에 속해있습니다. 그곁에 알프스산맥 전반에 걸쳐 그들의 전력과 수도를 공급하기 위한 매우 커다란 저수지가 있습니다.

해당 댐의 콘크리트 벽은 반드시 재조사하여 개선할 필요가 있었습니다. 해당 기간동안 프랑스 알프스 Savoy의 Hauteluce근처에 자리한 Girotte는 확실하게 결함이 보수 되었습니다. 너비 510미터, 높이 48.5미터의 규모를 간직한 이 댐은 1948년에 준공되었습니다.

본 보수는 작업자와 복구재질에 있어 큰 도전을 안겨줬습니다.
일부 대규모의 크랙들은 콘크리트의 너무 이르게 낡은 증상을 보였으며, 제어되지 못하여 남은 잔량의 물 또한 또다른 문제점을 만들고 있었습니다. 이미 본성을 잃은 크랙사이의 성분들을 제거한뒤 특수한 접착제, 아크릴젤을 잘 보이지 않고, 도달하기 힘든 부분까지 투여하여 씰링을 마무리하였습니다.

Dratec 사의 Polyura PC 4840 Purea 를 사용하여 노후된 콘크리트의 지점을 메꾸는 보호작업을 SPIE 회사가 맡아 수행하였습니다. 본 작업에 꼭 맞는 높은 기술력을 가진 회사를 선택하기에 있어 프랑스회사는 WIWA DUOMIX PU 460을 선택하였습니다. 이 장비의 핵심은 Fluid heater로써 Heat가 타사의 장비보다 약 70%정도 보다 더 멀리 시공될 수 있는 것입니다. 코팅 물성은 다른 물성과 혼합되지 않고 일반적으로 20도씨에서 85도씨 까지 불과 3분만에 가열이 됩니다. 장비를 사용하는 동안 안전성을 제공하고, 서로다른 압력을 스위칭하여 믹싱 비율을 제어할 수 있습니다.전기적으로 가열이 되는 호스는 최장 48미터까지 그 시공결과를 보장합니다.

Michel Laksander 라는 프랑스 WIWA 대표가 본 장비의 사상 첫 시공을 안전하게 진행하였으며, 미래의 SPIE 회사의 프로젝트도 더불어 함께 수행할 것입니다.